Sustainability/Governance ベラジョンanagement

Basic Approach

Daicel recognizes the vital role of ベラジョンanagement and adheres to its ベラジョンanagement Regulations so that it responds appropriately to the risks inherent in its corporate activities and minimizes the impact should any such risks materialize.

ベラジョンanagement System

Initiatives of the ベラジョンanagement Committee

Daicel established the ベラジョンanagement Committee in 2006 to coordinate and promote the ベラジョンanagement for Daicel Corporation and its Group companies. Chaired by the corporate compliance officer and comprising the heads of each corporate support division as members, the committee meets once a year for a regular meeting and convenes extraordinary meetings as needed.
Each organization submits risk activity reports to the committee. At ベラジョンegular meeting, the committee reviews the progress of risk-related measures based on those reports, and an inventory of potential risks, and it provides advice and support as necessary. Risks requiring a company-wide response are addressed by setting up projects and implementing other measures. Given the changes in business environment and social circumstances surrounding the Daicel Group, some risks considered to require closer scrutiny are designated as focus points, and each organization confirms and reviews their measures against these risks.
The committee reports on its discussions about the focus points, the status of countermeasures addressing risks that could have a major impact on the Daicel Group’s management, the ベラジョンanagement policy for the coming fiscal year, the status of business continuity plans (BCP), and other key issues during the Management Meetings and Board of Directors Meetings at the end of each fiscal year.

Initiatives of the Daicel’s Corporate Divisions and the Group Companies

ベラジョンanagement conducted by each organization constitutes the backbone of these efforts for the Daicel Group as a whole.
Each organization implements its ベラジョンanagement in accordance with the following procedures.

  1. 1Identify and categorize risks that could have a major impact on the ability to achieve its business targets (Check)
  2. 2Categorize risks into three stages according to their frequency and degree of impact and identify ベラジョンquiring a priority response (Check)
  3. 3Consider the best possible countermeasures for preventing the risks from materializing and for minimizing damage in the event they materialize and formulate plans (improve the content of the countermeasures based on consultation with the managers in charge of ベラジョンanagement of each corporate support division of Daicel) (Act/Plan)
  4. 4Implement countermeasures (Do)
  5. 5Re-evaluate ベラジョンisks (Check) and reconsider countermeasures based on ベラジョンesults (Act)

Each organization follows a check-act-plan-do (CAPD) cycle* from 1 through 5 by registering ベラジョンisks and countermeasures into an intranet database and updating the status of implementation, leading to more appropriate countermeasures.
At the end of each fiscal year, they prepare a risk activity report which is submitted to the ベラジョンanagement Committee to provide updates on their risk inventory, including the status of implementation, newly identified risks, and the results of their review of the focus points.

*Instead of a Plan, Do, Check, and Act (PDCA) cycle, the most widely known approach to continuous improvement, Daicel has adopted a CAPD improvement cycle to avoid ベラジョンisk of overlooking crucial facts and realities that often lie hidden in the initial planning stage.

Targeted Risk Categories

  1. 1ベラジョンlated to business strategy
  2. 2ベラジョンlated to production technology, production equipment and utilities
  3. 3ベラジョンlated to construction and repair (including safety, quality, purchasing, etc.)
  4. 4ベラジョンlated to stable supply of products
  5. 5ベラジョンlated to intellectual property
  6. 6ベラジョンlated to purchasing and procurement
  7. 7ベラジョンlated to quality management and product liability
  8. 8ベラジョンlated to responsible care (including environmental problems), accidents, and disasters
  9. 9ベラジョンlated to information systems / networks and information security
  1. 10ベラジョンlated to group management / control
  2. 11ベラジョンlated to legal and corporate compliance*1
  3. 12ベラジョンlated to employment, human resources and employee fraud / crime*2
  4. 13ベラジョンlated to finance / investment, credit, finance, and accounting
  5. 14ベラジョンlated to public relations and inappropriate information use
  6. 15ベラジョンlated to antisocial groups and social communities
  7. 16ベラジョンlated to climate change
  8. 17ベラジョンlated to human rights
  • *1Includes ベラジョンlated to bribery and other corruption
  • *2Includes ベラジョンlated to occupational health and safety

Focus Points for FY2024/3

We have set “Understanding of important risks surrounding the Daicel Group” as a focus point for FY2024/3. The secretariat focused on the “important risks surrounding the Daicel Group" that each corporate support division was aware of in the area under its control, and then aggregated ベラジョンisks, compiled them into a report, reported them to the Management Meeting and the Board of Directors, and reflected them in the “Business Risks” section of the securities report.

Since the establishment of the ベラジョンanagement Committee in FY2007/3, Daicel has been led by the ベラジョンanagement Committee to engage in ベラジョンanagement activities by all of the Group, and in FY2024/3, we have considered a fundamental review of our ベラジョンanagement system and initiatives based on the following.

  • In FY2023/3, a serious problem of “misconduct related to third-party certification” by a Group company was found.
  • In recent years, in addition to ベラジョンapid changes in the external environment, the importance of geopolitical risks and climate change risks has also increased, and the need to respond to a diverse range of risks is becoming increasingly important.

As a result of the review, the structure of the ベラジョンanagement Committee was revamped in April 2024, and in particular, the secretariat to promote ベラジョンanagement activities was enhanced. Each corporate support division participates as a secretariat, exchanges opinions with internal and external experts and each department, and determines the points to be strengthened as focus themes. We also decided to consider how to conduct a risk inventory and introduce management tools.

Going forward, under the new ベラジョンanagement system, we will oversee and promote all activities related to ベラジョンanagement within the Group.

Risk Assessments of Critical Cases

When deliberating on capital investments or investments and loan projects important to management strategy, Daicel extensively considers ベラジョンisk inventory and countermeasures during the Management Meetings and other gatherings.
Under the total assessment system we have established, we take every possible precaution in terms of the environment and health and safety by comprehensively* assessing all business activities and diverse risks in advance.

*This covers new plans in all business activities, including research and development, production, consumption, and disposal.

Total Environmental, Health and Safety Assessment System

Information Security

The Daicel Group takes information security measures relevant to the IT systems of the entire Daicel Group, in accordance with the Information Systems Security Policy.

Information Security / Information Management

Strengthening BCP Management

The Daicel Group formulates and manages business continuity plans (BCPs) to minimize damage and decreases in operational capability in the event of emergencies, such as major disasters or a pandemic caused by a new virus, as well as to maintain business operations or at least ensure the early resumption of business operations.
The Group organizes BCPs in three concrete stages, from “Preparedness” (BCP I) to “Initial Contingency Response” (BCP II) and “Resumption of Operations” (BCP III).

  1. BCP Ⅰ
    Development of infrastructure for software and hardware
    Anti-seismic reinforcement, measures against liquefaction and inundation, system redundancy (operational and information systems), secure methods of telecommunications and information gathering, reviews of stockpiled materials including spare equipment and supplies, safe storage of raw materials and products, measures for crime prevention and security, and other initiatives.
  2. BCPⅡ
    Initial response to contingencies
    Systematic repetition of drills for fast and effective decision-making and action; preparation and revision of procedural documents and manuals used in the event of emergencies and contingencies.
  3. BCPⅢ
    Systematic planning for recovery of all operations
    Assessment of damage at plants, suppliers, and customer locations toward formulating and executing optimal plans for ベラジョンesumption of operations.

In addition, the Daicel Group has prepared “BCP for Individual Products” summarizing plans and information required to maintain or resume business operations for individual products or product groups as part of BCP III. It has also provided “Guidelines for formulating BCP” to stipulate the approach, procedures, and basic flow to maintaining or resuming business operations. Each business unit applies the guidelines to enable a faster and more appropriate response in the event of a disaster or damage.
We review the overall plan when appropriate to build an even more effective BCP.

In FY2024/3, we implemented the following initiatives.

Initiatives for FY2024/3

Preparedness (BCPⅠ)
  • Consider and implement preventive measures through risk assessments, and post-measures through crisis assessments for processes dealing with self-reactive substances
  • In preparation for material procurement risks, procure long lead-time components needed for the maintenance of proper inventory levels
Initial Contingency Response (BCPⅡ)
  • Confirm and review disaster risks, such as tidal waves and tsunamis, using hazard maps for each region in the Plan for a Resilient Japan
  • The planned installation of remote monitoring cameras and remote firefighting equipment
  • Enhance the information sharing system among sites in the company-wide disaster preparedness system
  • Review and consider disaster preparedness measures for wide-area disasters
  • Conduct disaster drills at each site, and confirm the operation of the company-wide information sharing system
Resumption of Operations (BCPⅢ)
  • Prepare BCPs for each product

*An assessment of response measures to prevent further damage or secondary accidents anticipating the occurrence of an accident

Emergency response system for large-scale disasters and disaster prevention drills (Process Safety and Disaster Prevention)

Response to Risks That Have Materialized

When risks materialize, the division responsible for the relevant risk category leads the response in line with the Emergency ベラジョンanagement Guidelines. The regulations designate the division responsible for each risk category as well as the divisions that will cooperate in the response. We also have the Disaster Response Rules based on the regulations and follow these rules in the event of an accident or disaster.